Iflexion’s team of 4 SharePoint developers, a designer, a project manager, a business analyst and a QA engineer participated in the project to cover the full cycle of SharePoint portal development. The project consisted of 3 phases.
Phaze 0. During the zero phase, the team made up a technical design specification to describe the scope of work in detail.
Phaze 1. The first phase included the creation of a functional corporate portal with document libraries, subsites, news, static pages and links to corporate resources.
Iflexion’s team offered the structure of the future SharePoint portal that would meet the Customer’s demands. The main site hosts subsites for each department, regional division and project. The main library has a folder with shared files that contains subfolders with documents of different departments and regional divisions as well as sample documents (application forms, standard contracts, supplements, etc.). Each subsite (department area) can have its own library.
The first project phase also supposed customizing the portal and designing it in line with the corporate style.
Phaze 2. In the framework of the SharePoint portal development, the team delivered additional SharePoint features such as employee surveys, the organizational structure, birthdays, the corporate calendar and custom web parts, including currency exchange rates, weather, and clock.
Iflexion also provided the Customer with testing and quality assurance services. Our QA engineer performed smoke, regression, acceptance and functional testing. The QA specialist detected several critical issues as well as numerous minor defects; SharePoint developers then fixed all of them.